Industry News

lulei decoration main production:PVC windows,aluminum windows.

« Hardcover room to open up new markets or affect the sanitary home storesWater plant building exterior paint project tenders »

Zhangshengyipian decoration materials market prices see the potential rise

   With the advent of another year of renovation season, paint, flooring, hardware, labor, see the potential tile prices are rising, some decoration companies offer 10-15% higher than before. What are prices, I bought two days ago to fill strip, over 6 years ago is the time to buy dollars, now 8 dollars, as well as gypsum board, wood panels have gone up more than ten dollars, floor prior to March 15 rose. "Mike's house from years ago, began renovation, and building materials prices surge to this round of his deep experience.

    Sorry did not keep stocks last

    Not get the house last fall, PVC windows Mike has been visiting the building materials market in preparation for the off-season before the prices did not "store" point building materials, storage of materials but on the one hand he did not place, he heard the other hand, generally to the price "May Day" until after the price increases, so Mike would like, buy the material in the 51 before the herd.

    But I did not expect: In March, aluminum windows the price will go up building materials, especially flooring, tiles and other large building materials, before him, promising a floor has been risen from 210 yuan per square meter to 268 yuan, is astounding. And floor tiles, wall tiles and other prices rapidly higher. "Could buy a solid wood floor, and now only buy laminate flooring, and if last year put a lot of things are bought, it can save thousands of dollars." He was very sorry.

    After years of building up too fierce

    "As the timber market supply is tight, larger price increases of imported timber, and thus boost the overall timber market price increases, price increases and even some wood continuously for over 20%." Nanjing, a wood dealer, said China's timber market supply and demand gap large, the total demand of wood each year about 300 million cubic meters, may actually supply about 200 million cubic meters. Reduction of raw materials, substrates prices lead directly to the floor price increases. The buyers in recent years an unprecedented renovation and Redu, so prices become an inevitable trend.

    Not just wood, paint prices continue to rise. In addition, since 2006, with copper as the main material prices a total of three times the tap, or an average of 20% or more, so involved in copper and aluminum metal parts from the original raw material price of the goods began to rise sharply last year, more than 80 brand wire block volume, this year has risen to 200-300 yuan / volume. Accordingly, the kitchen, lamps, doors, cabinets, also make a chain reaction, began to raise prices.

    Reporters also visited Nanjing yesterday morning more than building materials market, despite the various "special", "promotion", "discount" logo prominently hung in the various businesses of the store, but the sales staff, said in unison: the main building materials has gone up this year price, rose to the individual category of about 50%.

    Home improvement costs increased by 30%

    "Half Pack of 100 square meters of houses, the general quality of the materials to do with the basic decoration, 25,000 last year, enough, this year may have to 32,000 last year to spend 5,000 dollars will be able to finish the hydropower project, do the same thing this year to 7000 8,000 yuan. "decorative design manager for Smith Barney in Nanjing misty season, said that under the current situation, building materials prices, the average family half a pack of renovation costs to 30 percent higher than last year or so.

    It is understood that Nanjing Jinhua decoration decorative holiday offer has been increased 5% -10%, mainly due to rising prices of decorative building materials. The most commonly used home decoration wood panels, slightly better quality, from last year's 132 yuan / Zhang rose to 152 yuan / Zhang. Other workers higher wages is an important reason for price increases. Quarter misty said: "Last year, half a pack engineering, day workers, wages are 60-70 yuan / day, no food, accommodation of this year rose to 80-100 yuan / day, also food, accommodation."

    Greater impact on some small decoration company. As the market competition, many companies have expressed their decoration, not easily raise prices, the cost price can only rely on internal digestion.

Post comment:

◎welcome to give out your point。

Calendar

Comments

Previous

zhejiang lulei decoration main production:PVC windows,aluminum windows.